Hot line for investors

+7 (861) 251-77-64 abinsc_mz@mail.ru

Abinsk ElectroMetallurgical Plant LLC

Investment volume: 17.1 billion rublesNumber of new jobs: 3.5 thousand people

Abinsk ElectroMetallurgical Plant LLC is an enterprise of the South of Russia engaged in ferrous metallurgy. The plant provided with new jobs to more than 3.5 thousand people. 17.1 billion rubles have been invested in the three stages of the construction of the Abinsk Electrometallurgical Plant LLC since 2010.

As a result of the first stage, a small-scale rolling mill with the capacity of 500 thousand tons was put into operation on July 31, 2010.

From the second half of 2012, the construction of the second stage – the electric furnace shop with a capacity of 950 thousand tons of steel per year – was started. It was commissioned on June 11, 2014.

In 2014, the construction of the third stage – a rolling mill for the wire rod production with a capacity of 600 thousand tons per year – was started. The third stage was commissioned on May 24, 2016.